Workplace EV charging gives employees and company vehicles a place to recharge during the hours they are already parked at work.
For most businesses, the main challenge is not installing one chargepoint.
It is deciding how many employees need charging, how the spaces will be shared and how the additional electrical demand will be managed as EV ownership increases.
We install workplace EV chargers in Oxted for offices, warehouses, factories and other business premises.
Get a Workplace EV Charger Quote
Before choosing chargers, establish demand.
A workplace with 150 employees does not automatically need 150 charging points.
Some employees may already charge at home.
Others may not drive to work every day.
Some may own plug-in hybrids with relatively small charging requirements.
A useful starting point is to ask:
How many employees currently drive an EV?
How many cannot conveniently charge at home?
How many employees expect their next vehicle to be electric?
How far is the typical commute?
How long are vehicles parked?
Are company vehicles using the same car park?
This gives the business an evidence-based starting point.
For larger workplaces, a simple survey can help establish both current and likely future charging demand.
Useful questions include:
Do you currently own an electric vehicle?
Can you charge it at home?
Would you regularly use a workplace charger?
How far is your daily commute?
Are you considering an EV within the next few years?
The results can then be compared with the number of parking spaces and electrical capacity available.
That is more useful than choosing an arbitrary number of chargers.
Request a Workplace Charging Assessment
Employee charging benefits from one important characteristic: dwell time.
Many vehicles remain in the car park for most of the working day.
An employee arriving at 8:30am and leaving at 5pm provides several hours in which the vehicle can receive energy.
The charging requirement therefore becomes:
daily energy requirement + time parked + available site capacity
This can allow workplace charging to be distributed over time rather than every car demanding maximum power at once.
Workplace charging creates a new car-park resource.
The business needs to decide how that resource will be used.
Access might be available to:
All employees
Registered EV drivers
Company cars
Fleet vehicles
Visitors
Contractors
Specific tenants or departments
Smaller workplaces may manage this informally.
Larger installations can require access-control functionality within the charging system.
The policy should be established before selecting the equipment.
There is no single approach.
Some businesses provide EV charging as an employee benefit.
Others recover some or all of the electricity cost.
A workplace may also use different arrangements for different users.
For example:
company vehicles → business-funded
employees → paid or subsidised
visitors → separate access arrangement
Where the business wants user-level billing or charging records, this needs to be supported by the selected chargepoint platform.
Demand can exceed the number of available charging spaces.
A workplace can respond in several ways.
One is installing additional chargers.
Another is introducing a booking or usage policy.
Employees might:
Reserve a charging space
Move their car once charging is complete
Use designated charging periods
Share chargers between teams or shifts
The best arrangement depends on the size of the car park and how disruptive vehicle swapping would be.
Imagine ten employees regularly need workplace charging but the business currently has four chargers.
One solution is charger sharing.
Vehicles can be moved once they have received enough energy.
However, this relies on employees being available to move their cars.
Another approach is providing more charging positions and distributing the available electrical capacity between them.
The second option can reduce vehicle swapping even if individual chargers do not always operate at maximum output.
The decision is operational as much as electrical.
Shift-based workplaces create a different charging pattern from conventional offices.
A factory could have:
06:00 — morning shift arrives
14:00 — morning shift leaves
14:00 — afternoon shift arrives
22:00 — afternoon shift leaves
The same charging bays can therefore potentially serve several groups during a 24-hour period.
This can increase charger utilisation without necessarily increasing the number of physical spaces.
Shift patterns should be included when planning workplace charging in Oxted.
Office environments commonly have predictable working hours.
Employees arrive, park for several hours and then leave.
This creates a relatively long charging window.
The charging area can also serve visitors and company cars, although their needs may differ.
A practical office arrangement might separate:
employee spaces
visitor spaces
company vehicle spaces
Access and charging rules can then reflect those different users.
Factories can present a more complex electrical environment.
Machinery and production equipment may already consume substantial power.
That means workplace EV charging needs to be considered alongside production demand.
The amount of capacity available at 10am could be very different from the amount available overnight or between shifts.
Understanding the site's operating profile can therefore influence the charging strategy.
Warehouses often combine employee parking and commercial fleet activity.
These are separate charging requirements.
Employee cars may remain parked throughout a shift.
Electric vans may return later and need enough energy before morning.
The site can therefore contain:
staff charging
and
fleet charging
using common electrical infrastructure but different operational rules.
Keeping those use cases distinct can improve charger positioning and load management.
Get a Workplace Charging Quote
Every workplace charger adds electrical demand to the site.
Before finalising the system, the existing installation needs to be assessed.
Relevant factors can include:
Incoming electrical supply
Existing site demand
Distribution equipment
Charger quantity
Proposed charger output
Cable routes
Future expansion
A site's headline supply capacity is not the same thing as spare capacity.
The business may already be using a significant proportion of the available electricity.
Suppose 20 employee vehicles remain parked for eight hours.
They may not all need maximum charging output for the entire period.
Some cars may arrive with a high state of charge.
Some only need enough energy for a short commute home.
Others may finish charging early.
This creates an opportunity to distribute the available electrical capacity between active chargers.
That is one of the central principles behind managed workplace charging.
Load management can control how available charging power is distributed.
Instead of:
every charger → maximum demand
the system can work more like:
site capacity
↓
capacity available for EV charging
↓
connected vehicles
↓
power distributed between chargers
As demand changes, charging power can be adjusted.
This can help the workplace use its existing electrical infrastructure more effectively.
The building itself also changes how much electricity it uses.
An office may consume more during working hours.
A factory can have production-related peaks.
A warehouse may operate equipment in defined periods.
A suitable charging arrangement can account for the electrical capacity available while other site loads are operating.
This means EV charging does not have to be treated as a completely separate fixed demand.
Discuss Workplace Load Management
There is no universal workplace charger output.
The right level depends on:
vehicle requirement + parking time + electrical capacity
A car that remains parked for nine hours may not need particularly high charging power.
A company vehicle that only returns for a short period can have a greater requirement.
The charger specification should therefore follow the users.
This is one reason a workplace can sometimes use different charger types within the same site.
AC charging is commonly suited to employee vehicles because of their long parking periods.
Compatible vehicles receive AC electricity through their onboard chargers.
For a workplace, this can provide a practical balance between charging time and site electrical demand.
It is particularly relevant for:
Staff car parks
Offices
Business parks
Factories
Warehouses
Long-stay workplace parking
The exact output should be selected around the site rather than applying one rating to every installation.
Often, no.
An employee car parked all day usually has substantially more time available than a vehicle using a public rapid-charging site.
Installing rapid charging purely because it is faster can add unnecessary electrical demand.
Rapid or DC charging is more relevant where a defined business vehicle has limited downtime or where the site serves a separate high-turnover charging requirement.
Employee charging and rapid operational charging should therefore be treated as different use cases.
Workplace chargers can also serve electric company cars.
The business may want these vehicles to have priority over general employee charging.
Company cars can also require more detailed charging records where the organisation wants to monitor electricity usage.
Where vehicles are regularly taken home by employees, the workplace may only provide supplementary charging.
Where they remain at the site overnight, they can form part of the normal workplace charging schedule.
Get a Workplace EV Installation Quote
Visitors do not necessarily park for a full working day.
A charger near reception might serve clients attending meetings, suppliers or contractors.
Because parking duration can be shorter, visitor charging should be considered separately from employee charging.
The business may also want visitors to access the charger without giving them the same permissions as employees.
That makes user access an important equipment consideration.
A shared business park introduces questions around who owns and manages the chargers.
Several companies may use the same parking area.
Possible arrangements include:
Dedicated chargers for each tenant
Shared charging spaces
Centralised site charging
Restricted user groups
The electricity supply and billing model need to reflect the chosen approach.
Planning a shared system can be more practical than allowing multiple independent installations to develop without coordination.
A small workplace does not need a complicated charging network simply because the installation is commercial.
A company with five employees may only need one or two chargepoints.
The same fundamental questions still apply:
Who will charge?
How long do they park?
How much energy do they need?
What electrical capacity is available?
The charging arrangement can remain proportionate to the business.
Larger organisations usually need more formal planning.
As the number of users increases, the business may need:
Charger access management
User records
Load balancing
Central monitoring
Fault reporting
Expansion planning
Defined charging policies
The charging network starts to become an operational system rather than simply a collection of chargepoints.
Plan Your Workplace Charging Network
Connected charging systems can provide information about how the workplace network is being used.
Depending on the equipment, available information can include:
Charging sessions
Energy delivered
Charger availability
User activity
Equipment status
Fault alerts
This data can help answer a practical expansion question:
Do we actually need more chargers?
High utilisation may indicate additional provision is justified.
Low utilisation may suggest existing capacity is sufficient.
Employee EV ownership is likely to change over the life of the charging infrastructure.
A workplace can therefore plan around several stages.
Install for current demand.
Identify where additional chargers can be added.
Expand electrical distribution and active charger numbers where needed.
Manage larger numbers of users and charging sessions.
This avoids assuming today's charger count will remain correct indefinitely.
Where future demand is predictable, parts of the electrical infrastructure can be considered during the first installation.
Depending on the project, this can include planning:
Cable routes
Electrical distribution
Ducting
Containment
Charger positions
Parking areas
This is particularly useful where later expansion would otherwise require disruptive work across completed surfaces.
It does not mean every future charger needs to be purchased immediately.
The Workplace Charging Scheme remains available for eligible organisations.
The scheme supports eligible applicants with part of the cost of buying and installing workplace EV charging sockets.
Applications are subject to scheme requirements covering the organisation, parking, equipment and installation.
Where the Workplace Charging Scheme is being used, the business should establish eligibility before the installation proceeds.
Eligible chargepoint models and an OZEV-authorised installer are required for grant claims.
Ask About the Workplace Charging Scheme
A workplace should not assume it automatically qualifies for support.
The applicant and proposed installation need to meet the current scheme requirements.
For an eligible application, the customer applies before the installer makes the grant claim on their behalf.
The selected chargepoints also need to appear on the applicable eligible commercial chargepoint list.
Because grant rules change, current government guidance should be checked when the installation is being planned.
For eligible installations completed from 1 April 2026, the Workplace Charging Scheme currently allows up to £500 per socket to be claimed towards eligible costs.
The scheme has limits on the number of supported sockets.
Rather than designing the installation around the grant, the workplace should first establish what charging infrastructure it needs and then check what part of the eligible project can receive support.
Workplace charging equipment and the electrical installation need to satisfy the requirements relevant to the project.
Applicable requirements can include:
BS EN 61851
BS 7671
IET guidance for EV charging equipment
Electricity Safety, Quality and Continuity Regulations
Electricity at Work Regulations
Relevant building requirements
Where a Workplace Charging Scheme grant is claimed, the selected equipment must also satisfy the scheme's commercial chargepoint specification.
A workplace charging space should be considered as a complete parking environment.
Usability can be affected by:
Charger position
Surrounding space
Cable reach
Wheel stops
Kerbs
Bollards
Pedestrian routes
The equipment needs to be positioned so that users can practically reach and operate it.
Accessibility is therefore a site-layout consideration, not simply a property of the chargepoint.
Request a Workplace Charging Quote
For this type of project, I would approach the installation in this order.
Understand who needs charging now and who may need it later.
Decide access, payment and charger-sharing arrangements.
Choose practical charging locations.
Establish how much charging capacity is available.
Consider load management and user control.
Choose chargepoints appropriate for the workplace.
Identify whether future infrastructure should be included.
Complete the electrical work, chargepoint installation and required testing.
This ensures the workplace policy and user requirement determine the charging network rather than fitting workplace operations around whichever chargers happen to be installed.
For a workplace EV charging quote in Oxted, useful information includes:
Number of employees
Number of parking spaces
Current number of EV drivers
Estimated future EV demand
Typical working hours
Shift patterns
Company vehicles
Visitor requirements
Proposed charging spaces
Electrical supply information
Photographs of the car park
Existing chargers
Whether WCS funding is being considered
A site plan is also useful where the car park is large or charging will be installed in several areas.
We install workplace EV chargers in Oxted for offices, business parks, warehouses, factories and other commercial workplaces.
Projects can include individual staff chargepoints and larger managed charging networks incorporating load management, user access, monitoring and infrastructure for additional chargers.
The starting point is the workforce.
Establish who needs charging, how long their vehicles remain parked and how demand is likely to grow.
The charging equipment and electrical infrastructure can then be designed around the way the workplace actually operates.